In traditional systems the nozzles are mounted at 2/3 from blender outfeed. With this new high pressure injection system located inside the infeed chute, the whole length of the blender is exploited for the blending process, greatly increasing retention time
Resin consumption reduced by approximately 15% due to the improved resin distribution at high pressure and the longer retention time.